Raypak 751 Operations Instructions Page 33

  • Download
  • Add to my manuals
  • Print
  • Page
    / 57
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 32
33
This type of installation can cause non warrantable
problems with components and poor operation of the
unit due to the recirculation of flue products. Multiple
direct vent caps, when installed in the same horizontal
plane, should have three (3) foot clearance from the
side of one vent cap to the side of the adjacent vent
cap(s).
Combustion air supplied from outdoors must be free of
particulate and chemical contaminants. To avoid a
blocked flue condition, keep the vent cap clear of
snow, ice, leaves, debris, etc.
The Stainless Steel direct vent cap must be fur-
nished by the boiler manufacturer in accordance
with its listing.
WARNING: For common vent installations call
factory.
WARNING: No substitutions of flue pipe or vent
cap material are allowed. Such substitutions would
jeopardize the safety and health of inhabitants.
Fig. 24: Vertical Direct Venting/Combustion Air
(Category I)
*Vent lengths are based on a lateral length of 2 feet. Refer to the latest edition of National Fuel Gas Code for further details
(ANSI Z223.1) or in Canada, the latest edition of CSA B149 Installation Code.
Table N: Vertical Direct Venting without Add-on Condensing Heat Exchanger
ADB-1501
Page view 32
1 2 ... 28 29 30 31 32 33 34 35 36 37 38 ... 56 57

Comments to this Manuals

No comments